Method — 3 stagesFortis IT Solutions

Approach.

Every engagement follows the same three stages, whether it covers one server or an entire estate.

Method

  1. Audit

    We document what you run, what's exposed and what's out of support, and give you a written report.

  2. Harden

    Systems are brought to an agreed baseline. Every change is recorded and reversible.

  3. Operate

    Monitored, patched and reviewed on a fixed schedule, by us or alongside your own team.

Two engineers with laptops reviewing a row of server racks in a data hall
Fig. 6 — On-site reviewSurvey
Data hall corridor lined with server racks
Fig. 2 — Data hallCold aisle
Patch panel with blue and grey network cables
Fig. 3 — Patch panelCat6A
Fibre patch leads connected to a rack-mounted switch
Fig. 4 — UplinksOM4 fibre